Loading...
Blog2026-08-03T09:11:29+00:00

Benasque begins the implementation of an innovative Wastewater Treatment Plant (WWTP) for 9,000 inhabitants.

The long-awaited Wastewater Treatment Plant (WWTP) in Benasque has begun operations and has become a model of efficiency and sustainability in wastewater treatment for a population equivalent of 9,000 inhabitants. With a calculated water usage [...]

31/07/2026|Categories: PRESENT|

Alcañiz inaugurates an innovative Vocational Training classroom building at the CPIFP Bajo Aragón.

The Bajo Aragón Integrated Public Vocational Training Center (CPIFP) in Alcañiz now boasts a new Vocational Training (FP) classroom building. This project, which began in October 2022 and was completed in just 11 months, is [...]

31/07/2026|Categories: PRESENT|

The Pignatelli building is preparing for a sustainable future: a reduction of at least 30% in non-renewable primary energy consumption.

The iconic Pignatelli building, currently the seat of the Government of Aragon, is about to undergo an unprecedented transformation that will not only improve its energy efficiency but also its functionality and sustainability. This ambitious [...]

31/07/2026|Categories: PRESENT|

Architecture students participate in a workshop to learn more about the realities of landscape strategies in rural areas.

The aim of the course ‘Revitalizing Sparsely Populated Rural Environments: Landscape, Heritage, and Housing Strategies for the Arén-Sopeira-Betesa Axis (Noguera Ribagorzana Valley, Huesca)’ is to introduce final-year architecture students and those completing their Master's theses [...]

31/07/2026|Categories: PRESENT|

Construction work on the swimming pools at Barajas Airport in Madrid is entering its final phase.

Construction of the first municipal swimming pool in the Barajas district of Madrid is in its final stages. Waterproofing work has already begun on the pool basins and surrounding areas. Protective coverings will then be [...]

31/07/2026|Categories: PRESENT|
Go to Top