About Marketing C2

This author has not yet filled in any details.
So far Marketing C2 has created 14 blog entries.

El Grupo MLN se adhiere al centenario del Parque Nacional de Ordesa y Monte Perdido

El Grupo MLN se ha adherido al Centenario del Parque Nacional de Ordesa y Monte Perdido, evento que ha sido reconocido como Acontecimiento de Excepcional Interés Público (AEIP). Grupo MLN demuestra una vez más su compromiso con la sociedad aragonesa, colaborando en la realización, promoción y difusión del Centenario, para el cual el Gobierno de [...]

2018-07-26T08:49:44+00:00PRESENT|

PUBLICATIONS

Certificates Download PDF - COPHA CPF ÁRIDOS CE (2001104) Download PDF - MLN ISO 14001 RENOV. (180914) Download PDF - MLN ISO 9001 RENOV. (180818) Download PDF - COPHA UNE 166002 (181211) Download PDF - COPHA ISO 14001 (180630) Download PDF - COPHA ISO 9001 (180701) Download PDF - COPHA CPF MBC CE (200331) Environmental Performance [...]

2018-06-19T11:11:39+00:00PUBLICATIONS|

FIRM ROAD TECHNIQUES DAY

THE MLN CHAIR ORGANIZES THE TECHNICAL DAY OF FIRM ROADS, SUSTAINABLE ASPHALT SOLUTIONS   Among the activities that the Mariano López Navarro Chair is developing throughout the 2017-2018 academic year, the Firm Technical Road Conference was held on 17 April. Sustainable Asphalt Solutions, organized in collaboration with the Technical Association of Bituminous Emulsions (ATEB) with [...]

2018-06-19T10:57:01+00:00PRESENT|

RECOGNITION FOR PREVENTION AND REDUCTION OF OCCUPATIONAL ACCIDENTS

MLN GROUP RECEIVES RECOGNITION FOR ITS MANAGEMENT OF THE PREVENTION AND REDUCTION OF OCCUPATIONAL ACCIDENTS.   On 12 April, MLN Group received a bonus, an economic incentive granted by the Directorate General of Social Security Planning through Asepeyo, in recognition of those companies that have contributed in a contrastable manner to the reduction and prevention [...]

2018-07-02T12:02:16+00:00PRESENT|

UTEBO WWTP

UTEBO WASTEWATER TREATMENT PLANT GOES INTO OPERATION Last October 1st, the Utebo WWTP came into operation, according to the contract for the Construction Project of the Infrastructures necessary for the treatment of Wastewater in the municipalities of Utebo, La Joyosa, Pinseque, Sobradiel, Torres de Berrellen and Zaragoza, which has executed a joint venture formed by [...]

2018-07-02T12:05:27+00:00PRESENT|
Go to Top