paulasanzmln

About Paula Sanz

This author has not yet filled in any details.
So far Paula Sanz has created 255 blog entries.

The construction of the Alcañiz Hospital is complete, pending the installation of equipment for its inauguration.

Construction of the new Alcañiz Hospital has been completed. The MLN Group was responsible for the largest part of the project, the civil engineering work, meeting the established deadlines and the required quality standards. The new hospital building, designed to offer high-quality medical services, comprises a series of blocks of up to four stories, in [...]

2026-07-31T13:22:59+00:00PRESENT|

The first stone has been laid for the new Emergency Center in Huesca.

The foundation stone has been laid for the Huesca Emergency Center, officially marking the start of construction on the new Fire Station. This center, which will be located on a plot of approximately 10,700 m² next to the Mulo roundabout and near the Provincial Nursery, will feature facilities designed to improve emergency response in the [...]

2026-07-31T13:18:45+00:00PRESENT|

The MLN Group was awarded the contract to complete the works of the Ana María Navales CPI in Arcosur.

The MLN Group has been selected as the winning bidder to complete the construction of the Ana María Navales Integrated Public School (CPI), located in the Arcosur neighborhood. The Ana María Navales CPI's primary education program comprises nine primary classrooms, a gymnasium, a multipurpose room, and a library, distributed across two separate buildings: Building 1, [...]

2026-07-31T13:17:24+00:00PRESENT|

Construction begins on the new Hispanidad Civic Center.

The first step in the construction of the Hispanidad Civic Center has been taken with the laying of the foundation stone. This new space will be built on a 7,400 m² municipal plot, located next to the Monasterio de Nuestra Señora de los Ángeles street, and will consist of two interconnected buildings. The center will [...]

2026-07-31T13:15:58+00:00PRESENT|

The MLN Group launches an innovative product line: sustainable concrete.

The MLN Group, a leading construction company in Aragon, is launching an innovative product line: E-Copha, sustainable concrete. This new range reflects the MLN Group's deep commitment to sustainable development and environmental preservation. MLN Group's sustainable concrete is the result of a careful selection of raw materials, such as aggregates and cement, characterized by their [...]

2026-07-31T13:13:55+00:00PRESENT|

Construction of the summer swimming pools in the Barajas district of Madrid has been completed.

The Barajas district in Madrid is celebrating the completion of its new summer swimming pools. These facilities are built on a large plot of land measuring over 3,200 square meters. The complex features a 630-square-meter outdoor swimming pool and a 49-square-meter wading pool. The project also included the construction of additional facilities to ensure the [...]

2026-07-31T13:12:07+00:00PRESENT|

Grupo MLN completes the construction of the JV20 Forest sawmill in Andorra, reinforcing its presence in Teruel

The MLN Group has completed the construction of the sawmill for the timber company JV20 Forest in Andorra. This project, supported by the Government of Aragon through its declaration of regional interest, stands out for its scale and complexity, with an approximate investment of nearly €8 million. From the outset, the MLN Group embraced the [...]

2026-07-31T13:10:59+00:00PRESENT|

Construction begins at the Calahorra Intermodal Station in La Rioja.

The MLN Group has begun construction on the Calahorra Intermodal Station. On a 10,695-square-meter plot, the works are well underway, marking a milestone in the modernization of the town's transport infrastructure. The project includes the creation of a new bus station adjacent to the train station, with access from Viacampo Street. In addition to the [...]

2026-07-31T13:09:38+00:00PRESENT|

The MLN Group will build 106 VPPA homes in the Alto del Arenal neighborhood in Madrid..

The MLN Group will build 106 subsidized rental housing units in the Alto del Arenal neighborhood, in the Puente de Vallecas district of Madrid. The properties will be located on a plot of more than 28,500 square meters, which will be entirely dedicated to affordable rental housing.36 of these units will have two bedrooms, 60 [...]

2026-07-31T13:08:57+00:00PRESENT|

Work on the construction of the new Civil Guard barracks in Utrillas is progressing well..

Construction of the new Civil Guard barracks in Utrillas is progressing satisfactorily. Earthmoving work has been completed, and the project is now in the foundation and underground drainage phase. The new barracks will be strategically located at the entrance to the town, on two plots of land donated by the City Council, adjacent to the [...]

2026-07-31T13:08:08+00:00PRESENT|
Go to Top