The first stone has been laid to begin construction of the new Ateca residence in Calatayud.
The foundation stone has been laid for the new residence in Ateca, in the province of Calatayud. Various political representatives, institutional representatives, and members of the Group were present at the ceremony. It will be [...]
The SiC Department acquires equipment that allows testing the tightness of each joint individually.
This equipment allows for individual leak testing of each joint between precast concrete pipes. Leaks in sewer pipes are among the most common problems. These can become very costly because the infrastructure is buried. Therefore, [...]
The King inaugurates the Mobility Museum “Mobility City”; the MLN Group participated in the building’s adaptation work.
King Felipe VI attended the inauguration of the Bridge Pavilion, which has been renovated and transformed into Spain's first technology museum. The building's renovation was divided into several phases. The first phase, carried out by [...]
Construction continues on El Cañaveral 01, in Madrid
The Mayor of Madrid, José Luis Martínez-Almeida, visited the construction site of El Cañaveral 01 in the capital. The project comprises 82 apartments with 2, 3, and 4 bedrooms, communal areas, ground-floor commercial spaces, and [...]
We’re launching two 100% electric Nissan Leafs!
We have added two 100% electric cars to our fleet, both of which already have the DGT's ZERO emissions sticker. This is a compact car, 4.49 meters long, with five doors and five seats, which [...]
Carbon footprint calculation 2021
The impact of human activities is increasingly negatively affecting the health of the planet. It is necessary to rethink our actions from the perspective of the sustainability of our environment if we want to preserve [...]





