{"id":15794,"date":"2026-08-03T07:11:05","date_gmt":"2026-08-03T07:11:05","guid":{"rendered":"https:\/\/www.grupo-mln.com\/blog\/uncategorized\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion"},"modified":"2026-08-03T07:11:05","modified_gmt":"2026-08-03T07:11:05","slug":"the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion","status":"publish","type":"post","link":"https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion","title":{"rendered":"The new Hispanidad Civic Center is entering its final stage: the MLN Group has reached 80% completion."},"content":{"rendered":"<div class=\"n4sEPd\">\n<div class=\"QFw9Te BLojaf\"><\/div>\n<div class=\"FFpbKc\">\n<div class=\"xMmqsf\">\n<div class=\"nidPne\">\n<div data-show-delay-ms=\"250\" data-append-to-body=\"true\" data-propagate-tooltip-mouseover-events=\"true\" data-anchor-corner=\"bottom-left\" data-enable-skip-handler=\"true\" data-popup-corner=\"top-left\">\n<div class=\"dig2sb\">\n<div class=\"scLCMd\">\n<div id=\"itamenu\"><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">The construction, led by the MLN Group, is now in the interior finishing and exterior cladding phase, shaping a space that will be a benchmark for sustainability and community service.<\/span><\/span><\/div>\n<div><\/div>\n<div><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">The future Hispanidad Civic Center is now a tangible reality.<\/span><\/span> <span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">The works, carried out by the MLN Group, are progressing well and have already reached 80% completion.<\/span><\/span> <span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">This new facility, destined to become the social heart of the district, is beginning to show its final form after months of intensive technical work.<\/span><\/span><\/div>\n<div><\/div>\n<div><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">Progress on the exterior and interior On the exterior of the complex, the fa\u00e7ade work is in its final stage with the installation of the last glazing panels.<\/span><\/span> <span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">One of the project&#8217;s most distinctive elements, its unique metal roof, is already visible from V\u00eda Hispanidad, where the first completed sections with aluminum panels can be seen.<\/span><\/span><\/div>\n<div><\/div>\n<div><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">Inside, the progress is equally significant: <\/span><\/span><\/div>\n<ul>\n<li><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">Classroom building: The ceilings have been completed, and paving and painting work has begun.<\/span><\/span><\/li>\n<li><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\">Auditorium: Stage partitioning begins this month.<\/span><\/span><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\"> Elevator core in the service building to ensure universal accessibility throughout the complex.<\/span><\/span><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\"> Paving and finishing work in the 1,380-square-meter multipurpose hall.<\/span><\/span><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\"> Construction progress on the connecting corridors of the Senior Citizens&#8217; Center.<\/span><\/span><span class=\"jCAhz ChMk0b\"><span class=\"ryNqvb\"> Space designated for a library and study rooms on the upper floor of the service building.<\/span><\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-15794 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"instalacion-ascensor-accesibilidad-centro-civico\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/instalacion-ascensor-accesibilidad-centro-civico-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/instalacion-ascensor-accesibilidad-centro-civico-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"N\u00facleo de ascensores en el edificio de servicios para garantizar la accesibilidad universal en el complejo.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/instalacion-ascensor-accesibilidad-centro-civico-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/instalacion-ascensor-accesibilidad-centro-civico-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"interior-sala-multiusos-centro-civico-hispanidad\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/interior-sala-multiusos-centro-civico-hispanidad-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/interior-sala-multiusos-centro-civico-hispanidad-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Trabajos de pavimentaci\u00f3n y acabados en la sala de usos m\u00faltiples de 1.380 metros cuadrados.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/interior-sala-multiusos-centro-civico-hispanidad-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/interior-sala-multiusos-centro-civico-hispanidad-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"pasillo-distribuidor-acabados-interiores-grupo-mln\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/pasillo-distribuidor-acabados-interiores-grupo-mln-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/pasillo-distribuidor-acabados-interiores-grupo-mln-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Estado de las obras en los pasillos de conexi\u00f3n del Centro de Convivencia para Mayores.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/pasillo-distribuidor-acabados-interiores-grupo-mln-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/pasillo-distribuidor-acabados-interiores-grupo-mln-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"sala-estudio-biblioteca-centro-civico-hispanidad-obras\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/sala-estudio-biblioteca-centro-civico-hispanidad-obras-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/sala-estudio-biblioteca-centro-civico-hispanidad-obras-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Espacio destinado a biblioteca y salas de estudio en la planta superior del edificio de servicios.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/sala-estudio-biblioteca-centro-civico-hispanidad-obras-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/sala-estudio-biblioteca-centro-civico-hispanidad-obras-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n<p>A complex of over 3,000 m\u00b2<\/p>\n<p>The project, located on a 7,400 m\u00b2 municipal plot next to Calle del Monasterio de Nuestra Se\u00f1ora de los \u00c1ngeles, comprises two interconnected buildings totaling 3,194 m\u00b2 of constructed area:<\/p>\n<ul>\n<li>Multipurpose Block (1,380 m\u00b2): A single-story structure that will house the Multipurpose Hall and an exhibition area.<\/li>\n<li>Service Building (1,810 m\u00b2): Distributed over two levels. The ground floor will house the reception area, the Senior Citizens&#8217; Center, and a bar-restaurant. The upper floor will be dedicated to education and culture, with workshops, study rooms, a library, and spaces for physical activities.<\/li>\n<\/ul>\n<p>Side view of the two interconnected buildings of the Hispanidad Civic Center, totaling over 3,000 square meters of construction.<br \/>\nExterior finishes and technical enclosures on the side facade of the civic center&#8217;s annex building.<\/p>\n<p>Exterior cladding and technical enclosures on the annex building of the new civic center.<\/p>\n<p>Detail of the installation of high-performance glass at the entrance of the Hispanidad Civic Center.<\/p>\n<p>General view of the Hispanidad Civic Center at 80% completion, with a focus on energy efficiency.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-2 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-2 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-2 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-2 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-2' class='gallery galleryid-15794 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"fachada-exterior-obras-centro-civico-hispanidad\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/fachada-exterior-obras-centro-civico-hispanidad-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-exterior-obras-centro-civico-hispanidad-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Vista lateral de los dos edificios interconectados del Centro C\u00edvico Hispanidad, sumando m\u00e1s de 3.000 metros cuadrados de construcci\u00f3n.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-exterior-obras-centro-civico-hispanidad-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-exterior-obras-centro-civico-hispanidad-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"fachada-edificio-anexo-obras-grupo-mln-zaragoza\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/fachada-edificio-anexo-obras-grupo-mln-zaragoza-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-edificio-anexo-obras-grupo-mln-zaragoza-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Acabados exteriores y cerramientos t\u00e9cnicos en la fachada lateral del edificio anexo del centro c\u00edvico.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-edificio-anexo-obras-grupo-mln-zaragoza-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-edificio-anexo-obras-grupo-mln-zaragoza-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"cubierta-metalica-aluminio-fachada-via-hispanidad\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/cubierta-metalica-aluminio-fachada-via-hispanidad-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cubierta-metalica-aluminio-fachada-via-hispanidad-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Revestimiento exterior y cerramientos t\u00e9cnicos en el edificio anexo del nuevo centro c\u00edvico.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cubierta-metalica-aluminio-fachada-via-hispanidad-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cubierta-metalica-aluminio-fachada-via-hispanidad-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"cristalera-entrada-eficiencia-energetica-centro-civico-hispanidad\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/cristalera-entrada-eficiencia-energetica-centro-civico-hispanidad-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cristalera-entrada-eficiencia-energetica-centro-civico-hispanidad-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Detalle de la instalaci\u00f3n de cristales de alto rendimiento en la entrada del Centro C\u00edvico Hispanidad.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cristalera-entrada-eficiencia-energetica-centro-civico-hispanidad-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/cristalera-entrada-eficiencia-energetica-centro-civico-hispanidad-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"fachada-principal-centro-civico-zaragoza-obras-grupo-mln\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/the-new-hispanidad-civic-center-is-entering-its-final-stage-the-mln-group-has-reached-80-completion\/attachment\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Vista general del Centro C\u00edvico Hispanidad al 80% de su construcci\u00f3n con enfoque en eficiencia energ\u00e9tica.\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln-66x66.jpg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln-150x150.jpg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n<p>Commitment to Energy Efficiency<\/p>\n<p>Adhering to current standards of responsible construction, the MLN Group is implementing highly energy-efficient solutions. The building will feature reinforced insulation in walls and roofs, as well as high-performance glazing.<\/p>\n<p>Climate control will rely entirely on sustainable systems, combining aerothermal energy with photovoltaic energy generation installed on the roof itself, ensuring optimized ventilation and a low environmental impact.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction, led by the MLN Group, is now in the interior finishing and exterior cladding phase, shaping a space that will be a benchmark for sustainability and community service. The future Hispanidad Civic Center is now a tangible reality. The works, carried out by the MLN Group, are progressing well and have already reached  [&#8230;]<\/p>\n","protected":false},"author":4,"featured_media":15489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[81],"tags":[],"class_list":["post-15794","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-present"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hispanidad Civic Center: The MLN Group reaches 80% completion of the project<\/title>\n<meta name=\"description\" content=\"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hispanidad Civic Center: The MLN Group reaches 80% completion of the project\" \/>\n<meta property=\"og:description\" content=\"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\" \/>\n<meta property=\"og:site_name\" content=\"Grupo MLN\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-03T07:11:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"866\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Paula Sanz\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Paula Sanz\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\"},\"author\":{\"name\":\"Paula Sanz\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\"},\"headline\":\"The new Hispanidad Civic Center is entering its final stage: the MLN Group has reached 80% completion.\",\"datePublished\":\"2026-08-03T07:11:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\"},\"wordCount\":466,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg\",\"articleSection\":[\"PRESENT\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\",\"url\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\",\"name\":\"Hispanidad Civic Center: The MLN Group reaches 80% completion of the project\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg\",\"datePublished\":\"2026-08-03T07:11:05+00:00\",\"author\":{\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\"},\"description\":\"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage\",\"url\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg\",\"contentUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg\",\"width\":1300,\"height\":866,\"caption\":\"Vista general del Centro C\u00edvico Hispanidad al 80% de su construcci\u00f3n con enfoque en eficiencia energ\u00e9tica.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.grupo-mln.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The new Hispanidad Civic Center is entering its final stage: the MLN Group has reached 80% completion.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#website\",\"url\":\"https:\/\/www.grupo-mln.com\/fr\/\",\"name\":\"Grupo MLN\",\"description\":\"Grupo MLN\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.grupo-mln.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\",\"name\":\"Paula Sanz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g\",\"caption\":\"Paula Sanz\"},\"sameAs\":[\"https:\/\/www.grupo-mln.com\"],\"url\":\"https:\/\/www.grupo-mln.com\/en\/blog\/author\/paulasanzmln\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hispanidad Civic Center: The MLN Group reaches 80% completion of the project","description":"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln","og_locale":"en_US","og_type":"article","og_title":"Hispanidad Civic Center: The MLN Group reaches 80% completion of the project","og_description":"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.","og_url":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln","og_site_name":"Grupo MLN","article_published_time":"2026-08-03T07:11:05+00:00","og_image":[{"width":1300,"height":866,"url":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg","type":"image\/jpeg"}],"author":"Paula Sanz","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Paula Sanz","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#article","isPartOf":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln"},"author":{"name":"Paula Sanz","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04"},"headline":"The new Hispanidad Civic Center is entering its final stage: the MLN Group has reached 80% completion.","datePublished":"2026-08-03T07:11:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln"},"wordCount":466,"commentCount":0,"image":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage"},"thumbnailUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg","articleSection":["PRESENT"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln","url":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln","name":"Hispanidad Civic Center: The MLN Group reaches 80% completion of the project","isPartOf":{"@id":"https:\/\/www.grupo-mln.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage"},"image":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage"},"thumbnailUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg","datePublished":"2026-08-03T07:11:05+00:00","author":{"@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04"},"description":"Construction of the Hispanidad Civic Center is nearing completion. Grupo MLN is leading this 3,000 m\u00b2 project, a benchmark in sustainability.","breadcrumb":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#primaryimage","url":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg","contentUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2026\/02\/fachada-principal-centro-civico-zaragoza-obras-grupo-mln.jpg","width":1300,"height":866,"caption":"Vista general del Centro C\u00edvico Hispanidad al 80% de su construcci\u00f3n con enfoque en eficiencia energ\u00e9tica."},{"@type":"BreadcrumbList","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/centro-civico-hispanidad-obras-grupo-mln#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.grupo-mln.com\/"},{"@type":"ListItem","position":2,"name":"The new Hispanidad Civic Center is entering its final stage: the MLN Group has reached 80% completion."}]},{"@type":"WebSite","@id":"https:\/\/www.grupo-mln.com\/fr\/#website","url":"https:\/\/www.grupo-mln.com\/fr\/","name":"Grupo MLN","description":"Grupo MLN","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.grupo-mln.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04","name":"Paula Sanz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g","caption":"Paula Sanz"},"sameAs":["https:\/\/www.grupo-mln.com"],"url":"https:\/\/www.grupo-mln.com\/en\/blog\/author\/paulasanzmln"}]}},"_links":{"self":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts\/15794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/comments?post=15794"}],"version-history":[{"count":0,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts\/15794\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/media\/15489"}],"wp:attachment":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/media?parent=15794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/categories?post=15794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/tags?post=15794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}