{"id":15792,"date":"2026-08-03T07:03:19","date_gmt":"2026-08-03T07:03:19","guid":{"rendered":"https:\/\/www.grupo-mln.com\/blog\/uncategorized\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing"},"modified":"2026-08-03T07:03:19","modified_gmt":"2026-08-03T07:03:19","slug":"construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing","status":"publish","type":"post","link":"https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing","title":{"rendered":"Construction of the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe is progressing"},"content":{"rendered":"<p>The project shows significant progress in structure and finishes.<br \/>\nThe MLN Group continues construction of the 51 public housing units on Paseo de la Estaci\u00f3n, in the El Ros\u00f3n neighborhood of Getafe, according to schedule. The works are progressing well both inside and outside the building.<\/p>\n<p>The fa\u00e7ade, made with prefabricated concrete panels, is now complete, as are the waterproofing of the roof and patios. This ensures the building&#8217;s durability and resistance to inclement weather.<\/p>\n<p>Work by Floor<br \/>\nInside, the ground, first, and second floors have plasterboard partitions installed on the first few walls, and the plumbing, electrical, and telecommunications installations are complete. On the third floor, the plasterboard framing and electrical wiring have been installed, while plumbing work continues.<\/p>\n<p>Regarding the fourth floor, the electrical installation and waterproofing work have been completed, with the start of the partition walls still pending. On the fifth floor, three apartments with underfloor heating have been completed, and installation of the system in the warehouse has begun to optimize timelines.<\/p>\n<p>Work on the garage is at a very advanced stage. The brickwork, the installation of fire-resistant and metal doors, as well as the forced extraction, lighting, and fire protection systems, have already been completed. Only some finishing touches and plastering remain.<\/p>\n<p>A Sustainable and Efficient Project<br \/>\nThis project, promoted by the Getafe Municipal Land and Housing Company (EMSV), includes the construction of 51 public housing units, 28 of which will be for sale and 23 for rent. All the apartments will have an average usable floor area of \u200b\u200bover 75 m\u00b2, offering spacious and functional living areas.<\/p>\n<p>The building is being constructed to near-zero energy standards and will have an A energy rating. Among the planned technical solutions are air conditioning using aerothermal technology, high airtightness of the building, a ventilation system with heat recovery, the installation of photovoltaic panels on the roof, and a communal terrace for the use of future residents.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-15792 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"WhatsApp Image 2025-12-18 at 16.54.46\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing\/attachment\/whatsapp-image-2025-12-18-at-16-54-46-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46-66x66.jpeg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46-150x150.jpeg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"WhatsApp Image 2025-12-18 at 17.02.40\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing\/attachment\/whatsapp-image-2025-12-18-at-17-02-40-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.40-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.40-66x66.jpeg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.40-150x150.jpeg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"WhatsApp Image 2025-12-18 at 17.02.42\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing\/attachment\/whatsapp-image-2025-12-18-at-17-02-42-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.42-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.42-66x66.jpeg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.02.42-150x150.jpeg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"WhatsApp Image 2025-12-18 at 17.06.18\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing\/attachment\/whatsapp-image-2025-12-18-at-17-06-18-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.06.18-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.06.18-66x66.jpeg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.06.18-150x150.jpeg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon portrait'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"WhatsApp Image 2025-12-18 at 17.13.22\" data-caption=\"\" href='https:\/\/www.grupo-mln.com\/en\/blog\/present\/construction-of-the-51-public-housing-units-on-paseo-de-la-estacion-in-getafe-is-progressing\/attachment\/whatsapp-image-2025-12-18-at-17-13-22-2'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.13.22-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.13.22-66x66.jpeg 66w, https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-17.13.22-150x150.jpeg 150w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>The project shows significant progress in structure and finishes. The MLN Group continues construction of the 51 public housing units on Paseo de la Estaci\u00f3n, in the El Ros\u00f3n neighborhood of Getafe, according to schedule. The works are progressing well both inside and outside the building. The fa\u00e7ade, made with prefabricated concrete panels, is now  [&#8230;]<\/p>\n","protected":false},"author":4,"featured_media":15432,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[81],"tags":[],"class_list":["post-15792","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-present"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe<\/title>\n<meta name=\"description\" content=\"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe\" \/>\n<meta property=\"og:description\" content=\"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\" \/>\n<meta property=\"og:site_name\" content=\"Grupo MLN\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-03T07:03:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Paula Sanz\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Paula Sanz\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\"},\"author\":{\"name\":\"Paula Sanz\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\"},\"headline\":\"Construction of the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe is progressing\",\"datePublished\":\"2026-08-03T07:03:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\"},\"wordCount\":336,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg\",\"articleSection\":[\"PRESENT\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\",\"url\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\",\"name\":\"Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe\",\"isPartOf\":{\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg\",\"datePublished\":\"2026-08-03T07:03:19+00:00\",\"author\":{\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\"},\"description\":\"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage\",\"url\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg\",\"contentUrl\":\"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg\",\"width\":1600,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.grupo-mln.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe is progressing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#website\",\"url\":\"https:\/\/www.grupo-mln.com\/fr\/\",\"name\":\"Grupo MLN\",\"description\":\"Grupo MLN\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.grupo-mln.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04\",\"name\":\"Paula Sanz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g\",\"caption\":\"Paula Sanz\"},\"sameAs\":[\"https:\/\/www.grupo-mln.com\"],\"url\":\"https:\/\/www.grupo-mln.com\/en\/blog\/author\/paulasanzmln\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe","description":"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe","og_locale":"en_US","og_type":"article","og_title":"Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe","og_description":"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.","og_url":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe","og_site_name":"Grupo MLN","article_published_time":"2026-08-03T07:03:19+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg","type":"image\/jpeg"}],"author":"Paula Sanz","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Paula Sanz","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#article","isPartOf":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe"},"author":{"name":"Paula Sanz","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04"},"headline":"Construction of the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe is progressing","datePublished":"2026-08-03T07:03:19+00:00","mainEntityOfPage":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe"},"wordCount":336,"commentCount":0,"image":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage"},"thumbnailUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg","articleSection":["PRESENT"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe","url":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe","name":"Construction progresses on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe","isPartOf":{"@id":"https:\/\/www.grupo-mln.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage"},"image":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage"},"thumbnailUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg","datePublished":"2026-08-03T07:03:19+00:00","author":{"@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04"},"description":"Construction is progressing on the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe, an efficient building with an A energy rating.","breadcrumb":{"@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#primaryimage","url":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg","contentUrl":"https:\/\/www.grupo-mln.com\/wp-content\/uploads\/2025\/12\/WhatsApp-Image-2025-12-18-at-16.54.46.jpeg","width":1600,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/www.grupo-mln.com\/blog\/actualidad\/viviendas-publicas-paseo-estacion-getafe#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.grupo-mln.com\/"},{"@type":"ListItem","position":2,"name":"Construction of the 51 public housing units on Paseo de la Estaci\u00f3n in Getafe is progressing"}]},{"@type":"WebSite","@id":"https:\/\/www.grupo-mln.com\/fr\/#website","url":"https:\/\/www.grupo-mln.com\/fr\/","name":"Grupo MLN","description":"Grupo MLN","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.grupo-mln.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/c5d89a2110a273cd2ce6586228bffb04","name":"Paula Sanz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupo-mln.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aaff65b7be8d1e892eb98f0429ca11b0b2ca5b8d247ee62531957578710469e?s=96&d=mm&r=g","caption":"Paula Sanz"},"sameAs":["https:\/\/www.grupo-mln.com"],"url":"https:\/\/www.grupo-mln.com\/en\/blog\/author\/paulasanzmln"}]}},"_links":{"self":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts\/15792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/comments?post=15792"}],"version-history":[{"count":0,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/posts\/15792\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/media\/15432"}],"wp:attachment":[{"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/media?parent=15792"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/categories?post=15792"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupo-mln.com\/en\/wp-json\/wp\/v2\/tags?post=15792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}